Fish Landing Centres PDF Print E-mail


Fish Landing Centres for mechanised boats

Government of India have sanctioned the following 9 fish landing centres for mechanisd boats

  1. Kasaragod
  2. Neeleswaram
  3. Cheruvathur
  4. Dharmadam
  5. New Mahe
  6. Munakkakadavu
  7. Chettuvai
  8. Chathanad
  9. kunjithy

Fish landing centre for traditional fishermen

  1. Bekkal
  2. Kottakkeel
  3. Kizhunnappara
  4. Chalil gopalapettah
  5. Puthiyangadi
  6. Kuriyadi
  7. Thikkodi
  8. Vellayil
  9. Quilandy
  10. Vallikkunnu
  11. Palappetti
  12. Paravanna
  13. Kaipamangalam
  14. Edakkazhiyoor
  15. Vypeen
  16. Cheriyakadavu
  17. Ezhikkara
  18. Murinjapuzha
  19. Pathiyankara
  20. Muttathumannel
  21. Muhamma
  22. Arthungal
  23. Punnapra
  24. Kattoor Pollathai
  25. kadapra
  26. Sambranikodi
  27. Poonthura
  28. Vizhinjam South
  29. Vizhinjam North
  30. maryanadu
  31. Pulluvila

 

Kattoor-Pollathai The land required for the project was purchased and the inauguration of the fish landing centre was conducted on 31.12.96. Construction of compound wall around the department land and construction of administrative block is almost completed. All other works were nearing completion.
Punnapra Land required for the project is purchased and foundation stone for the project was laid on 3.12.96. Construction of compound wall was completed except the gate. Construction of Administrative Block, Locker Room, Lavatory Block and Security Room, Canteen and Provision store, etc. were almost completed and the project is ready for commissioning.
Ettikkulam The fish landing centre for traditional fishermen at Ettikulam was sanctioned by Government for an amount of Rs.85.20 lakhs during January 98. The land required for the project is to be acquired. Government of Kerala issued sanction for the project for an amount of Rs.91.20 lakhs including land acquisition costs. Agreement executed and work commenced for weigh bridge.
Kanhangad, Thikkodi, Kadapra, Poovar These fish landing centers were sanctioned by Government of India during 3/99 costing RS 123.18 lakhs. The works are  being arranged and in preliminary stages.